Installation Works for Self-Regulating Heating Cables
一、Preparing Work:
(1). Test the electronic circuit integrated and insulation capability of all cable tracing.(2). Exterior inspections both Electronic equipment and control, could not use the transmutative, Chapped, spare part are not completed and could not repair
(3). Check up the pipe serial number according to heating cable chart. Then install as been confirmed correct。
(4). It can not be installed without Products tagged, blurred or unable to identify,
(5). The Work of Heating pipes must be completed and tested by Hydraulic test (Hermetic experiment).
二、The installation Plan .
 |